In capacity as: CIVIL ENGINEERING TECH III CAD TECH III Moore Engineering, Inc. - Minot, North Dakota
Water Treatment Plant Addition (2023) Garrison, North Dakota Rerouting of existing transmission lines for raw water municipality and rural water. ● Managing up to 12-man crews of concrete/rebar installation for new foundation
Sanitary Sewer Reline (2023) Makoti, North Dakota Cleaning, televising and relining of 6,000+ linear feet of sanitary sewer.
Water Tower Project (2023) McClusky, North Dakota Erection of steel water tower with concrete foundation. ● Ensure foundation rebar and concrete poured per specifications ● Worked closely with weld and coating inspectors ● Coordinated with cities and coating installers to ensure finishing art was correct
North Dakota DOT (2022) Minot, North Dakota Road work within the city of Minot to improve road smoothness for vehicle traffic within 10 city blocks. CTRL Click to View Project. ● Mill and overlay ● Surface restoration ● ADA improvements ● Successful traffic control ● Ensured job site safety ● Management of all equipment and 15-man crews: dirt, concrete, asphalt, electrical, seeding, traffic control, stripers
Northeast Tioga Reconstruction (2021) Northeast Tioga Reconstruction (2020) Tioga, North Dakota Resident Project Representative for $5 million sanitary sewer, storm sewer, water main and street improvements. ● 9 blocks sanitary sewer ● 2 blocks storm sewer ● 10 blocks water main replacement
Water Tower Project (2020) Glenburn, North Dakota Erection of steel water tower with concrete foundation. ● Ensure foundation rebar and concrete poured per specifications ● Worked closely with weld and coating inspectors ● Coordinated with cities and coating installers to ensure finishing art was correct
Water Main Replacement (2019) McClusky, North Dakota ● 12 blocks water main replacement ● Several Lead services removed and replaced ● 2 blocks storm sewer and related ditching
Water Tower Project (2019) Turtle Lake, North Dakota Erection of steel water tower with concrete foundation. ● Ensure foundation rebar and concrete poured per specifications ● Worked closely with weld and coating inspectors ● Coordinated with cities and coating installers to ensure finishing art was correct
Water Tower Project (2019) Makoti, North Dakota Erection of steel water tower with concrete foundation. ● Ensure foundation rebar and concrete poured per specifications ● Worked closely with weld and coating inspectors ● Coordinated with cities and coating installers to ensure finishing art was correct
Parking Lot Access, Storm Sewer, Utilities for Tribal Community Center (2019) St. Cloud, Minnesota ● Staking out of gas, electric and communications locations for new installations ● Observation of curb, gutter and asphalt for large parking lot and access road
Sewer, Water and Storm Sewer Improvements (2018) Glen Ullin, North Dakota Resident Project Representative for $5 million USDA Rural Development funded sanitary sewer, storm sewer and water main replacement project within the city. ● Spot repairs and relining of sanitary sewer for entire city ● 4 blocks storm sewer improvements ● 7 blocks water main replacement
Sanitary Sewer and Water Main Replacement (2017) Rolette, North Dakota Resident Project Representative for $2.1 million USDA Rural Development funded sanitary sewer and water main replacement project within the city. ● 9 blocks of sanitary sewer ● 7 blocks water main replacement
Water Treatment Plant Improvements (2017) Rolla, North Dakota Resident Project Representative for $3.88 million USDA Rural Development funded water system improvement project within the city. ● Installation of new water production wells ● Installation of raw water transmission line to the water treatment plant
Storm Sewer Improvements (2016) Harvey, North Dakota Resident Project Representative for a storm sewer installation project within the city. ● Installation of 4-blocks of 48-inch storm ● Installation of 3 blocks of 12-inch storm sewer
Street Rehab and Drainage (2016) Fessenden, North Dakota Resident Project Representative for Bank of ND’s Infrastructure Revolving Loan Fund funded storm sewer replacement project. ● Surface and subsurface drainage improvements within the community
Stonebridge 3rd Addition (2015) Minot, North Dakota Resident Project Representative of privately constructed Stonebridge subdivision within the city. Click to View Project. ● Installation of curb and gutter ● Street improvements
Street Rehabilitation and Storm Sewer Placement (2014) Rolla, North Dakota Resident Project Representative for a utility and street replacement project within the city. ● 7 blocks of storm sewer replacement ● Street rehab ● Asphalt placement
Street Rehabilitation (2013) Hazen, North Dakota Resident Project Representative for street reconstruction and rehabilitation project within city. ● Asphalt milling ● HBP asphalt overlay
Sanitary Sewer Design (2012) Benedict, North Dakota Drafting and preparation of plans for three blocks of sanitary sewer replacement within the city.
Minot Infrastructure Improvements (2012) Minot, North Dakota ● Designed and observed tie ins and connections for privately owned/constructed projects within the city ● Observed and documented construction of city infrastructure improvements
Buffalo Bill Center of The West Addition Cody, Wyoming Mechanical Room addition to the BBHC complex using 240 linear feet of 40-foot tall, 16” thick walls. Click to View Project.
Buffalo Bill Center of The West Addition Cody, Wyoming Draper Natural History addition to the BBHC complex using 210 linear feet of 40-foot tall, 16” thick walls, of which 100’ was poured on a 100’radius. Click toView Project. Poured and finished 85,000+ sq. ft. parking lot in 4 days with crew. Click toView Project.
Shoshone Irrigation District Improvements Park County, Wyoming Concrete inlet, outlet and overflow structures for 4’ inverted syphon, for 300 linear feet. Click to View Inlet. Click to View Outlet. Click to View Overflow.
Shoshone Irrigation District Improvements Park County, Wyoming Replacement of irrigation diversion damn with fish ladder on north side of Greybull River, placement of gates, imbeds and riprap. Click toView Project.
Best Western Premiere Ivy Inn & Suites Cody, Wyoming Erection of new hotel foundation with 20’ basement walls and concrete parking lot. Click to View Project.
Private Home Cody, Wyoming Erection of multi-dimensional, new home foundation with various wall height and thicknesses. Implemented hollow core flooring for 1st floor. Click to View Project.